Pre-blast Survey for AngloGold Ashanti Siguiri Gold Mine (SAG)


This project involves structural integrity assessment of buildings located in three communities near proposed mining areas. It also involves predicting the impact of mining on the buildings within the communities.

Blast and Noise Impact Modeling for Golden Star Wassa Limited


This project predicted the impacts of blasting on building structures adjacent to proposed open pits of Golden Star Wassa Limited (a gold mining company in Ghana). It also predicted the impact of noise on surrounding communities of the pits. Blast and noise impacts prediction models were developed for adoption by the mine. Final report was approved by the Environmental Protection Agency (EPA) of Ghana (Regulatory body). The mine was saved from huge resettlement/compensation cost and operates at peace with catchment communities.

Noise, Air & Water Quality and Blast Impact Assessment, West Africa Quarries Limited


Particulate levels at WAQL (quarry) and surrounding communities were assessed. Noise levels were evaluated. Air and sound quality impacts of proposed activities at the quarry on surrounding communities were predicted. Stream water quality was also assessed. Building structures in the community were assessed and characterized. Impacts of blasting on building structures in the communities were predicted.

Air Quality and Noise Impact Studies of Nkran Waste Rock Dump Construction, Adansi Gold Company Limited


Total Suspended Particulate (TSP) and Particulate Matter <10 µm (PM10) levels at the proposed Nkran waste rock dump of Adansi Gold Company Limited and surrounding communities were assessed. Noise levels were also assessed. Air and sound quality impacts of proposed waste rock dump activities on the Nkran and Koninase communities were predicted.

Installation of Automatic Weather Station, AngloGold Ashanti (Iduapriem) Limited


Automatic weather monitoring equipment was assembled and installed at the mine. Personnel were trained in equipment handling; data acquisition and processing.

Structural and Blast Impact Assessment for Golden Star Resources


This project predicted the impacts of blasting on building structures adjacent to the Father Brown Pit of Golden Star Wassa Limited (a gold mining company in Ghana). Structural mapping and assessment were conducted. Blast impact prediction modeling was developed for adoption by the mine.

Air Quality, Noise and Blast Impact Studies for Adansi Gold Company Limited


Particulate levels at Adansi Gold Company Limited and surrounding communities were assessed. Noise levels were evaluated. Air and sound quality impacts of proposed activities at the mine on surrounding communities were predicted. Impacts of blasting on building structures in the communities were predicted.

Installation of Air Particulate Monitoring Equipment, AngloGold Ashanti (Iduapriem) Limited


Air quality monitoring equipment (Topas and Osiris) were assembled. Suitable sites for installation were selected, and equipment installed. Personnel were trained in equipment handling; data acquisition and processing.

Particulate and Noise Studies at Greenfields Tailings Storage Facility, AngloGold Ashanti (Iduapriem) Limited


Total Suspended Particulate (TSP) and Particulate Matter <10 µm (PM10) levels at the tailings storage facility of AngloGold Ashanti (Iduapriem) Limited and surrounding communities were assessed. Noise levels were also assessed. Air and sound quality impacts of the tailings storage facility construction and expansion on the neighboring settlements were predicted.

Air Dispersion and Blast Impact Modeling for Ajopa Project, AngloGold Ashanti (Iduapriem) Limited


Air dispersion and blast impact models were developed for AngloGold Ashanti (Iduapriem) Limited. The impact of blasting at the Ajopa pit of the mine on the surrounding settlement (Nkyemia) was determined.

Air Quality and Noise Monitoring, Baseline Environmental Studies for Adansi Gold Company Limited


Total Suspended Particulate (TSP) and Particulate Matter <10 µm (PM10) levels at Adansi Gold Company Limited and surrounding communities were assessed. Noise levels were also assessed.

Installation of Automatic Weather Station, AngloGold Ashanti (Iduapriem) Limited


Automatic weather monitoring equipment was assembled and installed. Personnel were trained in equipment handling; data acquisition and processing.